            Home > Products & Services > Ice Thermal Storage > District Cooling

            District Cooling

            5.Installation

            Date : 2014-03-05 17:11

            Above Grade Concrete Tanks

            The following section shows the flexibility in locating the thermal storage equipment. Examples include above grade concrete storage tanks at the Tampa Electric Company (TECO) Miami Plant, below grade tanks at Baltimore Comfort Link? Camden Yards District Cooling Plant and above grade round steel tanks at the Baltimore Comfort Link? District Plant II. Ice thermal storage equipment can be located below parking facilities, gardens, and driveways, in basements, on grade near the chiller plant or in the chiller plant.
            捕獲26
            1. Empty concrete tank with liner

            填充圖片

            填充圖片

            捕獲27
            2. Rigging first ice coil

            填充圖片

            填充圖片

            ?捕獲28
            3. Placement of the first two-coil module

            填充圖片

            填充圖片

            捕獲29
            4. Final placement of the first pair of two-coil modules

            填充圖片

            填充圖片

            ?捕獲30
            5. All coils in place in the tank. The coils are arranged four-coils high by two-coil modules wide by four-coils long.

            填充圖片填充圖片

            捕獲31
            6. Tank with glycol supply and return piping above coils

            填充圖片

            填充圖片

            捕獲32
            7.?Outdoor tank complete with concrete covers.Typical arrangement of glycol chillers in plant adjacent to the tank.
            填充圖片
            ?填充圖片

            Above Grade Cylindrical Steel Tanks

            捕獲33
            Above grade round steel tanks at the Baltimore Comfort Link? District Plant II

            填充圖片

            填充圖片

            ?捕獲34
            Aerial view of Baltimore’s Comfort Link? District Cooling Plant II. The concrete building with cooling towers on the roof, houses the chiller plant. Behind the chiller plant are two round steel ice thermal storage tanks.

            填充圖片

            填充圖片

            捕獲35
            Steel tanks located behind the cooling towers out of sight

            填充圖片

            填充圖片

            ?捕獲36
            Welded steel tank ready for ice thermal storage coils. No liner was required.

            填充圖片

            填充圖片

            捕獲37
            Final thermal storage coil being rigged into place

            填充圖片

            填充圖片

            捕獲38
            Ice coil pattern inside steel tank

            填充圖片

            填充圖片

            捕獲39
            Competed ice tanks

            填充圖片

            填充圖片

            填充圖片

            Below Grade Concrete Tanks

            捕獲40
            Overview of Baltimore’s Comfort Link? Camden Yard’s below grade concrete tank. The chiller plant and an additional ice thermal storage tank (located in the basement) is in the Convention Center across the street. Today a parking lot is located above the tank.

            填充圖片

            填充圖片

            捕獲41
            Excavation of the tank

            填充圖片

            填充圖片

            捕獲42
            Pouring concrete slabs

            填充圖片

            填充圖片

            捕獲43
            Glycol supply and return piping to chiller plant in the Convention Center across the street. The piping is located under a busy downtown street.

            填充圖片

            填充圖片

            捕獲44
            Field erected chillers in the Comfort Link? Chiller Plant located in the Convention Center

            填充圖片

            填充圖片

            ?捕獲45
            Ice Thermal Storage Tank roof poured in place

            填充圖片

            填充圖片

            捕獲46
            The roof of the tank is insulated

            填充圖片

            填充圖片

            捕獲47
            Access opening for rigging the coils in place

            填充圖片

            填充圖片

            捕獲48
            View from inside the tank

            填充圖片

            填充圖片

            捕獲49
            Installation of coils into tank through the access opening

            填充圖片

            填充圖片

            捕獲51
            Installation of coils into tank through the access opening

            填充圖片

            填充圖片

            捕獲52
            Ice Thermal Storage Coils in their final location in the tank

            填充圖片

            填充圖片

            捕獲53
            Completed ice tank with parking lot above. Below the dark paving on the street is the piping to and from the Convention Center chiller plant. The tank is accessible through bulkhead door (circled in photo) located adjacent to parking lot.
            ?